Some Key Takeaways from a Recent Meeting with a Data Center Developer
The riskiest moment in a data-center deal is not the ribbon-cutting — it is the press release. Before the next campus announcement, boards should pressure-test five critical questions.
The riskiest moment in a data-center deal is not the ribbon-cutting.
It is the press release.
Announce too early and you lock in narrative, expectations, and political attention before the site is ready. Walking it back costs more than a two-week delay.
Before the next campus announcement, boards should pressure-test five questions.
1. Power & Cost Causation
Who pays for the generation, transmission, and distribution upgrades if you are a large load?
"The utility will handle it" is not a strategy. Get the incremental-cost story straight first.
2. Water & Transparency
What is the cooling profile — and what are you comfortable disclosing if energy and water reporting advances?
Local water politics can stop a site faster than a hearing in Washington.
3. Exit Liability
If you scale down, pause, or exit early, who still pays for infrastructure built for your load?
That is a balance-sheet question, not a talking point.
4. Political & Regulatory Map
State PUC posture. Local zoning. Interconnection timing.
Separate headline risk from binding risk. A House vote can change the politics without changing your contract tomorrow morning.
5. Coalition Map
Who stands with you on day one? Who opposes you — and do you have a staff-ready one-pager when they do?
A narrow coalition that can carry the ask beats a broad letter that dilutes it.
If you cannot answer these five cleanly, you are not ready to announce.
You are ready to workshop.